GRIDSCOPE PRO ● CONNECTING

Load flow intelligence

NO NETWORK LOADED · SELECT A MODEL TO BEGIN

Active demand

MW

Awaiting power flow

POWER FACTOR

Minimum voltage

p.u.

Awaiting phase results

BUS-PHASE LIMITS

Peak equipment loading

%

Native rated equipment

OVERLOADED ASSETS

Active power losses

MW

Source injection unavailable

OF INJECTION

Feeder one-line

Interactive network · select an element to inspect

Your network, in perspective.

Load a multiconductor model to explore its topology and run a study.

Voltage · 0.95–1.03 p.u. · gray = unavailableSelect an element to inspect →

Voltage profile

Distance from source · retained bus phases

p.u. / km
━ Phase A━ Phase B┄ Phase C0.95–1.03 p.u.
Run power flow to populate phase results.

Equipment loading

Ranked by native conductor or winding rating

— ASSETS
Missing ratings remain unavailable.

Constraint violations

Complete phase voltage and equipment rating checks

— NEED REVIEW
Asset Constraint Phase Result Limit Deviation Action
Display limits: V 0.95–1.03 p.u. · Loading ≤ 100%

Study profiles

Power, loading and solver performance

Power along feeder

P · Q · S / solid MC · dashed DSS

Loading profile

Use native equipment ratings to evaluate violations.

Solver convergence

Voltage mismatch by iteration

Voltage distribution

All retained bus phases

Current readouts

No current results retained.

Export results

Download the current result, including its source and study parameters.